When the worst-case execution time estimation gains from the application semanticsReportar como inadecuado




When the worst-case execution time estimation gains from the application semantics - Descarga este documento en PDF. Documentación en PDF para descargar gratis. Disponible también para leer online.

1 IRIT - Institut de recherche en informatique de Toulouse 2 VERIMAG - IMAG - VERIMAG 3 Continental Automotive France Toulouse 4 ALF - Amdahl-s Law is Forever Inria Rennes – Bretagne Atlantique , IRISA-D3 - ARCHITECTURE

Abstract : Critical embedded systems are generally composed of repetitive tasks that must meet drastic timing constraints, such as termination deadlines. Providing an upper bound of the worst-case execution time WCET of such tasks at design time is thus necessary to prove the correctness of the system. Static timing analysis methods compute safe WCET upper bounds, but at the cost of a potentially large over-approximation. Over-approximation may come from the fact that WCET analysis may consider as potential worst-cases some executions that are actually infeasible, because of the semantics of the program and-or because they correspond to unrealistic inputs. In this paper, we introduce a complete semantic-aware WCET estimation workflow. We introduce some program analysis to find infeasible paths: they can be performed at design, C or binary level, and may take into account information provided by the user. We design an annotation-aware compilation process that enables to trace the infeasible path properties through the program transformations performed by the compilers. Finally, we adapt the WCET estimation tool to take into account the kind of annotations produced by the workflow.





Autor: Armelle Bonenfant - Fabienne Carrier - Hugues Cassé - Philippe Cuenot - Denis Claraz - Nicolas Halbwachs - Hanbing Li - Claire M

Fuente: https://hal.archives-ouvertes.fr/



DESCARGAR PDF




Documentos relacionados