An Integrated BIM System to Track the Time and Cost of Construction Projects: A Case StudyReportar como inadecuado




An Integrated BIM System to Track the Time and Cost of Construction Projects: A Case Study - Descarga este documento en PDF. Documentación en PDF para descargar gratis. Disponible también para leer online.

Journal of Construction Engineering - Volume 2015 2015, Article ID 579486, 10 pages -

Research ArticleUniversity of Ottawa, 161 Louis Pasteur Private, Ottawa, ON, Canada K1N 6N5

Received 25 June 2015; Revised 28 September 2015; Accepted 27 October 2015

Academic Editor: Eul-Bum Lee

Copyright © 2015 Ahmad Jrade and Julien Lessard. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Abstract

Many construction projects suffer from poor design and from inconsistent time and cost management. This situation has led to rethinking of the industry’s performance and how it could be improved. Technology is breaking through design and management practices. Earned value management EVM enables better management of time and cost constraints. Building Information Modeling BIM is recognized to improve the planning and realization of a construction project. The present paper proposes an integrated time and cost management system ITCMS, where an EVM platform is used in a virtual environment during the planning and construction phases of a project. The ITCMS enables early involvement and project integration plus thorough time and cost management. The system consists of four modules and 13 different processes. The ITCMS is beneficial at the design stage; construction professionals are able to synchronize the building model with time and cost parameters as well as optimize it through a clash detection process that results in budget and schedule compressions early on. The ITCMS is a useful tool for construction and engineering managers that strive to increase projects’ performance. The authors demonstrate in this paper the validity of using the ITCMS through an actual project.





Autor: Ahmad Jrade and Julien Lessard

Fuente: https://www.hindawi.com/