Using Coevolution Genetic Algorithm with Pareto Principles to Solve Project Scheduling Problem under Duration and Cost ConstraintsReportar como inadecuado




Using Coevolution Genetic Algorithm with Pareto Principles to Solve Project Scheduling Problem under Duration and Cost Constraints - Descarga este documento en PDF. Documentación en PDF para descargar gratis. Disponible también para leer online.

Journal of Information and Organizational Sciences, Vol.38 No.1 June 2014. -

This article considers the multicriteria optimization approach using the modified genetic algorithm to solve the project-scheduling problem under duration and cost constraints. The work contains the list of choices for solving this problem. The multicriteria optimization approach is justified here. The study describes the Pareto principles, which are used in the modified genetic algorithm. We identify the mathematical model of the project-scheduling problem. We introduced the modified genetic algorithm, the ranking strategies, the elitism approaches. The article includes the example.

project; project management; project scheduling; multicriteria optimization; Pareto principles; genetic algorithm



Autor: Alexandr Victorovich Budylskiy - ; Faculty of Informational Technologies and Communications, Astrakhan state technical university

Fuente: http://hrcak.srce.hr/



DESCARGAR PDF




Documentos relacionados