Status and First Results from the Upgraded PITZ FacilityReportar como inadecuado




Status and First Results from the Upgraded PITZ Facility - Descarga este documento en PDF. Documentación en PDF para descargar gratis. Disponible también para leer online.

1 LAL - Laboratoire de l-Accélérateur Linéaire

Abstract : Since December 2004, the photo injector test facility at DESY in Zeuthen PITZ has been upgraded. A normal conducting copper booster cavity has been installed and the diagnostics beamline has been strongly modified. An extended water cooling system has been installed and was successfully taken into operation. Actually, the new diagnostics elements are being commissioned. After the installation of the new 10 MW klystron in June-July, the gun can be conditioned towards higher average power, and the whole beamline including the booster will be taken into operation. First results from the commissioning phase including gun and booster conditioning are reported.





Autor: A. Oppelt K. Abrahamyan G. Asova J. Bähr G. Dimitrov U. Gensch H.-J. Grabosch J.H. Han S. Khodyachykh M. Krasilnikov S. Liu V. M

Fuente: https://hal.archives-ouvertes.fr/



DESCARGAR PDF




Documentos relacionados