Project Scheduling Problem with Uncertain VariablesReportar como inadecuado




Project Scheduling Problem with Uncertain Variables - Descarga este documento en PDF. Documentación en PDF para descargar gratis. Disponible también para leer online.

Project scheduling problem is mainly todetermine the schedule of allocating resources in order to balance the totalcost and the completion time. This paper chiefly uses chance theory to introduceproject scheduling problem with uncertain variables. First, two types of single-objective programming models with uncertain variables as uncertain chance-constrained model and uncertainmaximization chance-constrained model are established to meet differentmanagement requirements, then they are extended to multi-objective programmingmodel with uncertain variables.

KEYWORDS

Project Scheduling Problem; Uncertain Variable; Single-Objective Programming; Multi-Objective Programming

Cite this paper

Lin, L. , Lou, T. and Zhan, N. 2014 Project Scheduling Problem with Uncertain Variables. Applied Mathematics, 5, 685-690. doi: 10.4236-am.2014.54066.





Autor: Liang Lin, Ting Lou, Ni Zhan

Fuente: http://www.scirp.org/